Posted in building work

Render, Window, Dormer

Lots of action today, started rendering the side and back of the rear extension, fitted the upstairs window. The original roof has been removed completely from the dormer extended bedroom, and looks spacious!

Posted in building work

Rained Off

Carpenter has left for today as rain is causing too much disruption – it’ll be good when they do get inside and work isn’t dictated by the weather.

Posted in building work

Side Dormer Structure

The side dormer is adding some significant space to this room, it looks huge!

I believe over the next couple of weeks, the rear exterior will be finished, windows fitted, roof finished, render done. Then they will knock through to the lounge, and come back to the upstairs once the floor is finished in the lounge.

Posted in Yuffie

Yuffie, Pomchi Puppy

We interrupt this blog for a small, and cute, announcement.

Posted in building work

Water, water, everywhere

Water is pooling on the tarpaulin and is leaking through. Since the door was taped up, we didn’t go into this room, until ¬†we had water streaming out of the electrical sockets downstairs.

So now we’ve got a bucket under the leak, fingers crossed it doesn’t rain all night..

L1380370-Pano